First gas achieved from Tolmount East, part of the Humber Gathering System (HGS)

Tolmount East, the first tieback to the Humber Gathering System (HGS), has safely and successfully achieved first gas.

This is an important milestone for HGS and testament to the work delivered by operating partner ODE Asset Management, part of DORIS Group, and Harbour Energy, which included multiple walk to work and subsea construction campaigns, and engineering and construction for topsides modifications.

Congratulations to everyone involved at Kellas and our partners.

HGS, comprising the Tolmount platform and HGS pipeline, commenced operation in 2022 and transports natural gas from the Southern North Sea to the Easington terminal in East Yorkshire. It is part of our portfolio of energy infrastructure assets playing a critical role in UK energy security.

CONTACT US

Kellas Midstream Limited

6th Floor, The Capitol
431 Union St
Aberdeen
AB11 6DA

Tel: +44 (0) 1224 084520
Email: info@kellasmidstream.com


Pipeline Emergency

To report a pipeline emergency please call +44 (0)1642 546404 and ask for the Operations team.